Project

Sussex University – Broadcasting Studios

Works:

4Facilities were selected to design, supply, and install a cooling solution for 2x Broadcasting studios and 1x production office.

Works were carried out, outside normal working hours to minimise pupil & broadcasting disruption. 3x Fan coil units were positioned in such a way as to not disrupt existing sensitive equipment. A single wall mounted system selected for the production office.

All Fujitsu condensing units were located onto an external wall on dedicated cantilever brackets. Once installed, each system was commissioned and left in full working order, ensuring an optimal temperature for each area with minimal running noise.

Sites Maintaned
No items found.
Systems Installed
Fujitsu Air conditioning system
Systems Maintained
No items found.
No items found.
Interested in a career with us?
Job Opportunities